Module Synopsis

In this module students will be exposed to a more extensive study of building construction by investigating the latest and more advanced technology and practice of the industry; from the methods of documentation and site layout to all the advanced construction systems, energy efficiency, waste management, embodied energy as well as the latest construction methods. In addition it also intends to expose students to the study of construction through case studies of existing buildings and applying the construction methods and systems of the building into their own design while addressing the issues pertaining to ecological impact.

 

Module Learning Outcomes

Upon successful completion of the module, students will be able to:

1. Identify and collect relevant research data.

2. Explain a set of architectural and structural documentation.

3. Relate basic structural elements and structural principles in construction.

4. Analyse and document construction methods and materials

5. Evaluate existing construction system and detailing of the selected project.

6. Critique issues pertaining to construction principles, materials, techniques, codes of practice, process of assembly, and detailing.

7. Critique issues pertaining to energy efficiency, embodied energy as well as ecological impact.

8. Generate alternative construction solutions by means of sketches and drawings.

 

Project 1 – Alternative Construction Solutions

Objectives of Project

  1. To encourage analytical and critical study of the principles, practices and details of construction technology in the existing building.

  2. To encourage students to explore alternative construction systems

  3. To adapt and implement the alternative construction systems into the students’ design.

  4. To develop the students’ skills in producing working drawings.

 

Tasks - Methodology

Form a group of between 5 to 6 members. Each group member is to bring along previous semester’s design project to be discussed among themselves and their respective tutors in terms of the size and complexity of the project. Next, the group should choose and decide on which scheme that they want to work on for this assignment.

Then, at least 50 percent modifications are required to be performed on the original construction systems and to replace with different yet appropriate, more complex or recent building technology, preferably without affecting the plans.

Modifications should be carried out on the following building components:

i) Floor system

ii) Wall system

iii) Roof system

iv) To include a new basement level.

Any changes that affect the structural system (i.e.: columns and beams) and related elements (i.e.: windows and doors) should also be modified accordingly. A report should be produced which documents the precedent study as well as appropriate working drawings and detail drawings of the building.

Slide1.JPG

Slide1.JPG

Slide2.JPG

Slide2.JPG

Slide3.JPG

Slide3.JPG

Slide4.JPG

Slide4.JPG

Slide5.JPG

Slide5.JPG

Slide6.JPG

Slide6.JPG

Slide7.JPG

Slide7.JPG

Slide8.JPG

Slide8.JPG

Slide9.JPG

Slide9.JPG

Slide10.JPG

Slide10.JPG

Slide11.JPG

Slide11.JPG

Slide12.JPG

Slide12.JPG

Slide13.JPG

Slide13.JPG

Slide14.JPG

Slide14.JPG

Slide15.JPG

Slide15.JPG

Slide16.JPG

Slide16.JPG

Slide17.JPG

Slide17.JPG

Slide18.JPG

Slide18.JPG

Slide19.JPG

Slide19.JPG

Slide20.JPG

Slide20.JPG

Slide21.JPG

Slide21.JPG

Slide22.JPG

Slide22.JPG

Slide23.JPG

Slide23.JPG

Slide24.JPG

Slide24.JPG

Slide25.JPG

Slide25.JPG

Slide26.JPG

Slide26.JPG

Slide27.JPG

Slide27.JPG

Slide28.JPG

Slide28.JPG

Slide29.JPG

Slide29.JPG

Slide30.JPG

Slide30.JPG

Slide31.JPG

Slide31.JPG

Slide32.JPG

Slide32.JPG

Slide33.JPG

Slide33.JPG

Slide34.JPG

Slide34.JPG

Slide35.JPG

Slide35.JPG

Slide36.JPG

Slide36.JPG

Slide37.JPG

Slide37.JPG

Slide38.JPG

Slide38.JPG

Slide39.JPG

Slide39.JPG

Slide40.JPG

Slide40.JPG

Slide41.JPG

Slide41.JPG

Slide42.JPG

Slide42.JPG

Slide43.JPG

Slide43.JPG

Slide44.JPG

Slide44.JPG

Slide45.JPG

Slide45.JPG

Slide46.JPG

Slide46.JPG

Slide47.JPG

Slide47.JPG

Slide48.JPG

Slide48.JPG

Learning Outcomes of this Project

1. Identify and collect relevant research data.

2. Explain a set of architectural and structural documentation.

3. Relate basic structural elements and structural principles in construction.

4. Analyse and document construction methods and materials

Project 2 – Advanced Roof & Industrialised Building System

This project which consists of group and individual assessment components, predominantly relates to the topics of advanced roof construction, Industrialised Building System (IBS) as well as the embodied energy calculation. Prior to work on this project, students will be exposed with different types of advanced roof construction, IBS system and the calculation of embodied energy of different building materials in the classroom.

Task 1

Form a group of 6 students; it can be the same group as in Assignment 1. Then, perform a case study (or studies) on a building which i) has an advanced roof system (space frame or tensile fabric structure) and ii) was constructed using IBS construction system and report on, but not limited to the items listed below.

  • Introduction to the building (i.e. name, location, year it was built, the owner, the architect, the developer, etc.)

  • Identify all the advanced roof components used including appropriate images, sizes, etc. and to indicate clearly the location of each component.

  • Identify all the IBS components used including appropriate images, sizes, etc. and to indicate clearly the location of each component.

  • Identify the connections and joints between different components i.e.: roof and columns, columns and beams, etc.

Task 2

Individually, each student is required to use their building plans (ground level and level 1 only) for the previous design studio project (Studio 4) conduct the following tasks:

  • Where necessary, modify and simplify the plan of the building to make it suitable to be constructed using an advanced roof and IBS construction systems. As this is not a design class therefore the circulation and layout of the building is not a concern in this assignment.

  • Apply the appropriate advanced roof and the most suitable IBS systems to construct the building i.e. precast wall, formwork system, hollow core slab, precast staircase, toilet pod, prefabricated timber roof truss, etc. for the building envelope to replace the original construction systems.

  • Produce: i) all plans, ii) two elevations, iii) one section and iv) a detail sectional drawing of the building to show all the roof and IBS components used.

  • Describe about the construction systems used including images, sizes, etc. then identify clearly and explain where they were used.

  • Also provide in the report some descriptions about the building and construction system concerning energy efficiency and ecological impact as well as the embodied energy calculations.

Slide1.JPG
Slide2.JPG
Slide3.JPG
Slide4.JPG
Slide5.JPG
Slide6.JPG
Slide7.JPG
Slide8.JPG
Slide9.JPG
Slide10.JPG
Slide11.JPG
GROUNDFLOORPLAN-page-001.jpg
FIRSTFLOOR-page-001.jpg
ELEVATIONS-page-001.jpg
SECTION-page-001.jpg
SECTIONALDETAILDRAWING-page-001.jpg
Slide12.JPG

Learning Outcomes of this Project

1. Identify and collect relevant research data.

2. Evaluate existing construction system and detailing of the selected project.

3. Critique issues pertaining to construction principles, materials, techniques, process of assembly and detailing.

4. Critique issues pertaining to energy efficiency, embodied energy as well as ecological impact.

bottom of page